模具相关英语1

   2017-01-02 互联网7280
核心提示:padding block垫块 stepping bar垫条 upper die base上模座 lower die base下模座 upper supporting blank上承板 upp
         padding block垫块   
stepping bar垫条   
upper die base上模座   
lower die base下模座   
upper supporting blank上承板   
upper padding plate blank上垫板   
spare dies模具备品   
spring 弹簧   
bolt螺栓   
document folder活页夹   
file folder资料夹   
to put file in order整理资料   
spare tools location手工备品仓   
first count初盘人   
first check初盘复棹人   
second count 复盘人   
second check复盘复核人   
equipment设备   
waste materials废料   
work in progress product在制品   
casing = containerazation装箱   
quantity of physical invetory second count 复盘点数量   
quantity of customs count   
会计师盘,点数量   
the first page第一联   
filed by accounting department for reference会计部存查   
end-user/using unit(department)使用单位   
summary of year-end physical inventory bills   
年终盘点截止单据汇总表   
bill name单据名称   
This sheet and physical inventory list will be sent to accounting department together (Those of NHK will be sent to financial department)   
本表请与盘点清册一起送会计部-(NHK厂区送财会部)   
Application status records of year-end physical inventory List and physical inventory card 年终盘点卡与清册使用-状况明细表   
blank and waste sheet NO.   
空白与作废单号   
plate电镀   
mold成型   
material for engineering mold testing工程试模材料   
not included in physical inventory不列入盘点   
sample样品   
incoming material to be inspected进货待验   
description品名   
steel/rolled steel钢材   
material statistics sheet   
物料统计明细表   
meeting minutes会议记录   
meeting type 会别   
distribution department分发单位   
 
举报收藏 0打赏 0评论 0
点击排行