die模具
figure file, chart file图档
cutting die, blanking die冲裁模
progressive die, follow (-on)die
连续模
compound die复合模
punched hole冲孔
panel board镶块
to cutedges=side cut=side scrap切边
to bending折弯
to pull, to stretch拉伸
Line streching, line pulling线拉伸
engraving, to engrave刻印
upsiding down edges翻边
to stake铆合
designing, to design设计
design modification设计变化
die block模块
folded block折弯块
sliding block滑块
location pin定位销
lifting pin顶料销
die plate, front board模板
padding block垫块
stepping bar垫条
upper die base上模座
lower die base下模座
upper supporting blank上承板
upper padding plate blank上垫板
spare dies模具备品
spring弹簧
bolt螺栓
document folder文件夹
file folder资料夹
to put file in order整理资料
spare tools location手工备品仓
first count初盘人
first check初盘复棹人
second count复盘人
second check复盘复核人
equipment设备
waste materials废料
work in progress product在制品
casing = containerazation装箱
quantity of physical invetory second count复盘点数量
quantity of customs count
会计师盘,点数量
the first page第一联
filed by accounting department for reference会计部存查
end-user/using unit(department)使用单位
summary of year-end physical inventory bills
年终盘点截止单据汇总表
bill name单据名称
This sheet and physical inventory list will be sent to accounting
department together (Those of NHK will be sent to financial
department)
本表请与盘点清册一起送会计部-(NHK厂区送财会部)
Application status records of year-end physical inventory List and
physical inventory card年终盘点卡与清册使用-状况明细表
blank and waste sheet NO.
空白与作废单号
plate电镀
mold成型
material for engineering mold testing工程试模材料
not included in physical inventory不列入盘点
sample样品
incoming material to be inspected进货待验
description品名
steel/rolled steel钢材
material statistics sheet
物料统计明细表
meeting minutes会议记录
meeting type会别
distribution department分发单位
location地点
chairman主席
present members出席人员
subject主题
conclusion结论
decision items决议事项
responsible department负责单位